The Supreme Court has made tree-felling permission for a Rajasthan road project in the Taj Trapezium Zone conditional on compensatory planting and a verification report, while allowing 44 trees to be felled at Mathura Military Station after verification of 1,550 saplings. A connected order requires Central approval and planting safeguards before trees can be cut for a Bharatpur drainage project.

New Delhi: The Supreme Court has directed Rajasthan’s Forest Department to complete compensatory afforestation for a road-widening project and obtain verification by the Central Empowered Committee (CEC) before the applicant can act on permission to fell trees in the Taj Trapezium Zone.
The directions form part of two orders dated November 6, 2026, uploaded on November 16, 2026, in the continuing suo motu proceedings concerning the zone’s green cover and vision document. The Bench comprised Chief Justice Surya Kant and Justices Joymalya Bagchi and V. Mohana. These are orders on particular applications in ongoing proceedings, not final disposal of the environmental cases.
Bharatpur road: planting and inspection must come first
In In Re: Protection of Trees and Green Cover in the Taj Trapezium Zone, the Court considered Rajasthan State Road Development and Construction Corporation Limited’s applications for widening and strengthening the Bharatpur–Bayana–Gangapur–Bhadoti Road between Sewar and Salabad.
The CEC’s latest recommendation covered 329 trees—308 green and 21 dry—rather than the 335 sought at that stage. Six additional green trees could be saved. The conditions reproduced in paragraph 10 include planting 4,180 indigenous trees on identified land at Katariyapur, notifying 4.5 hectares as protected forest within six months, funding fencing and ten years’ maintenance, and planting suitable tall saplings along both sides of the completed road.
Senior advocate and amicus curiae Liz Mathew pointed out that compensatory planting had not yet been carried out. The applicant’s counsel said Rs 1,07,33,630 had been deposited with the Forest Department and land identified; that submission did not amount to confirmation that planting was complete.
In paragraphs 13–14, the Court directed the Forest Department to begin compensatory afforestation immediately, notify the CEC when the exercise was complete, and have the site inspected. Permission to fell the trees would operate once the CEC submitted its compliance report. The Court gave two months for the required exercise.
The Forest Department must also report to the CEC on missing green and dry trees. The recorded safeguards include a Rs 1 lakh penalty for each additional tree accidentally felled or damaged during the project.
ALSO READ: Supreme Court: No Tree Cutting Within 5 km of Taj Mahal Without Approval
Mathura Military Station: 44 trees permitted after verification
The same order separately allowed applications concerning Phase I of the Key Location Plan at Mathura Military Station, subject to continuing conditions. The Administrative Commandant had initially sought permission for 60 trees; the CEC recommended 44.
Paragraph 5 records that the CEC independently inspected the site and found all 1,550 saplings—550 compensatory and 1,000 additional native saplings—present, alive, healthy and adequately protected. On that basis, and after considering the amicus’s note, the Court granted permission in paragraph 7.
The applicant must continue maintaining the saplings for five years. The conditions also prohibit felling beyond the trees permitted and provide for recovery of Rs 1 lakh for each additional tree felled or damaged. The permission therefore remains tied to continuing obligations, despite verification of the initial planting.
Bharatpur drain: Central forest approval remains necessary
In the connected In Re: Vision Document for the Taj Trapezium Zone proceeding, Bharatpur Municipal Corporation sought permission to fell 51 trees for a flood-control and storm-water drainage project passing through the Central Nursery’s protected forest land. The CEC recommended saving two trees and permitting 49, while retaining the undertaking to plant 510 saplings.
The Court allowed the applications subject to the conditions reproduced in paragraph 8. These include planting indigenous saplings, notifying 0.880 hectares of compensatory land as protected forest, fencing, watering, ten years’ maintenance, advance funding and dust-control measures.
Paragraph 9 expressly requires prior Central Government approval for diversion of 0.1272 hectares of protected forest land. Under paragraph 10, the CEC must submit a further report on compensatory planting of 510 saplings before tree felling is permitted. The order thus does not provide an immediate, unconditional clearance to cut the trees.
ALSO READ: Supreme Court Seeks NCR Vehicle-Emission Enforcement Data, Orders Time-Bound Roadmaps
Tundla–Awagarh proposal awaits a report
In the green-cover proceeding, the Court also considered a separate proposal to fell 739 trees for four-laning the Tundla–Awagarh Road. With forest clearance still pending and differing statements about the road’s width, paragraphs 18–20 call for a CEC report addressing both matters. That application was posted for November 19; the order does not grant it tree-felling permission.
Taken together, the directions distinguish verified compliance from promises to plant. They allow the Mathura application after inspection, make the Rajasthan road permission dependent on completed planting and a CEC report, and retain the requirement of statutory forest approval for the Bharatpur drain.
Case details: Supreme Court of India; In Re: Protection of Trees and Green Cover in the Taj Trapezium Zone, Suo Motu Writ Petition (Civil) No. 8/2026; and In Re: Vision Document for the Taj Trapezium Zone, Suo Motu Writ Petition (Civil) No. 7/2026.
Bench: Chief Justice Surya Kant, Justice Joymalya Bagchi and Justice V. Mohana.
Order date: November 6, 2026. Upload date: November 16, 2026.
Status: Application-specific directions in continuing proceedings; remaining matters listed for November 19, 2026. No neutral citation is stated in these orders.
READ ORDER — TREE AND GREEN-COVER PROCEEDINGS